EasyManuals Logo
Home>Polaris>Offroad Vehicle>RZR PRO R 4

Polaris RZR PRO R 4 User Manual

Polaris RZR PRO R 4
508 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #311 background imageLoading...
Page #311 background image
8
9940259 R02 - 2022 RZR PRO R / PRO R 4 Service Manual
© Copyright Polaris Industries Inc.
8.11
5. Install wheel and five wheel nuts. Torque nuts to
specification.
TORQUE
Wheel Nuts:
148 ft-lbs (200 Nm)
HALF SHAFT / CV JOINT HANDLING
TIPS
Care should be exercised during half shaft removal or
when servicing CV joints. Half shaft components are
precision parts.
Cleanliness and following these instructions is very
important to ensure proper shaft function and a normal
service life.
The complete half shaft and joint should be handled by
getting hold of the interconnecting shaft to avoid
disassembly or potential damage to the half shaft
joints.
Over-angling of joints beyond their capacity could
result in boot or joint damage.
Make sure surface-ground areas and splines of shaft
are protected during handling to avoid damage.
Do not allow boots to come into contact with sharp
edges or hot engine and exhaust components.
The half shaft is not to be used as a lever arm to
position other suspension components.
Never use a hammer or sharp tools to remove or to
install boot clamps.
Be sure joints are thoroughly clean and that the proper
amount and type of grease is used to refill when joint
boots are replaced and when joints are cleaned. Refer
to text for grease capacity of CV joints and CV joint
boots.
FINAL DRIVE

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Polaris RZR PRO R 4 and is the answer not in the manual?

Polaris RZR PRO R 4 Specifications

General IconGeneral
BrandPolaris
ModelRZR PRO R 4
CategoryOffroad Vehicle
LanguageEnglish

Related product manuals