EasyManuals Logo
Home>PROLiNK>UPS>Professional II+ Series

PROLiNK Professional II+ Series User Manual

PROLiNK Professional II+ Series
24 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #3 background imageLoading...
Page #3 background image
1
1. SAFETY AND EMC INSTRUCTIONS
Please carefully read the following user instructions and safety instructions before installing the unit or
using the unit!
1-1. Transportation and Storage
Please transport UPS systems use only the original pakaging to protect against shocks and
impacts.
UPS should be stored in a ventilated and dry room.
1-2. Preparation
Condensation can occur if the UPS system is moved directly from a cold to warm environment.
The UPS system must be completely dry before installation. Please allow at least two hours for the UPS
to get used to its environment.
Do not install UPS systems near water or in humid environments.
Do not install a UPS system where it will be exposed to the sun directly or near the heater.
Do not cover the ventilation holes on the UPS.
1-3. Installation
Do not connect equipment or devices that would overload the UPS system *e.g. laser printer) to
the output of the UPS socket.
Place the cable in such a way that no one can step on it or trip.
Do not block the air vents on the UPS. The UPS should be placed in a location with ventilation
which is good. Make sure there is enough space for ventilation on each side.
UPS has provided a Grounding terminal, at the last installation, connect the UPS grounding to
the UPS battery external cabinet.
UPS should only be installed by expert and qualified personnel.
A suitable switch brake for short-circuit protection must
provided in building cabling installations.
An integrated emergency switch single switch will prevent further supply to the load by the UPS;
in some cases this must be provided in the cabling installation of the building.
Connect the grounding before connecting to the wiring terminals of the building.
Installation and Wiring shall be carried out in accordance with electrical laws and regulations
Local.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the PROLiNK Professional II+ Series and is the answer not in the manual?

PROLiNK Professional II+ Series Specifications

General IconGeneral
BrandPROLiNK
ModelProfessional II+ Series
CategoryUPS
LanguageEnglish

Related product manuals