30
Start-up process
1 Select the country and language
The CUBE display is a touchscreen consisting of three
buttons. Choose your country and language by navigating
with the arrows to the left or right. Set your country and
language by clicking on them.
2 Check installation
Three checks are now performed on the installation. During
these checks, click on the right arrow when you have
completed and checked the installation as described in
this manual.
3 Position the tap spout above the sink
You will then be asked whether the spout of your tap is
positioned above the sink. This is because water will come
out of the tap during the next step. Conrm with the arrow
pointing to the right.
4 The CUBE starts up
The CUBE then goes through a programme of four steps.
During this programme, check the display regularly to make
sure that the CUBE is not issuing any messages. After
cooling for around 40 minutes, the CUBE will display the
home screen and is now ready to use.
2
4
1
3