3.1 Installation checklist
Installation includes the following activities:
Installation Task
1 Plan your system.
2
Obtain all required equipment and tools.
3
Site all equipment.
4 Route all cables.
5
Drill cable and mounting holes.
6 Make all connections into equipment.
7
Secure all equipment in place.
8 Power on and test the system.
Schematic diagram
A schematic diagram is an essential part of planning any
installation. It is also useful for any future additions or
maintenance of the system. The diagram should include:
• Location of all components.
• Connectors, cable types, routes and lengths.
3.2 Parts supplied
The following parts are supplied with your product.
1 Thru-hull transducer
2 Dead rise block
3
Securing nut
4 Document pack
14
CPT-70 / CPT-80 / CPT-110 / CPT-120