3.1 Installation checklist
Installation includes the following activities:
Installation Task
1 Plan your system.
2
Obtain all required equipment and tools.
3
Site all equipment.
4 Route all cables.
5
Drill cable and mounting holes.
6 Make all connections into equipment.
7
Secure all equipment in place.
8 Power on and test the system.
16
Dragony 6 / Dragony 7