SHUTDOWN
5 INSPECTION AND MAINTENANCE
5.1 Why is regular maintenance important?
Heating systems require regular maintenance and service for the
following reasons:
to maintain a high level of efciency and to operate the
system economically (low fuel consumption),
to achieve a high level of operational reliability
to maintain the cleanest possible combustion
The operator is required to have the entire heating system at least
once a year maintained, serviced and cleaned.
We recommend that an annual inspection and as-required ser-
vice contract is signed.
The servicing work carried out should be recorded.
Burner servicing should be carried out in accordance with the in-
structions of the burner manufacturer.
5.2 Maintenance
9
DANGER: Risk to life from electric shock!
Before opening a unit: disconnect electrical power and lock
to prevent accidental reactivation.
9
DANGER: Risk to life from explosion of ammable gases!
Work on gas components must only be carried out by qual-
ied and authorized gas tters.
9
NOTICE:
All cover plates, enclosures, and guards must be in place at
all times, except during maintenance and servicing.
Analyze the combustion ue gas before commencing any main-
tenance.
The results of ue gas analysis can give a clear idea of what servic-
ing or repairs are needed.
5.3 Opening the door
To open the door, unscrew fully the main xing bolts holding the
door in place.
5.4 Adjusting the door
Make sure that the door presses uniformly all around the double
seal to prevent dangerous fumes escaping into the air. Proceed as
follows to adjust the door seals:
RTC 3000-RTC 4000-RTC 5000-RTC 6000
Fit the door and tighten the main xing bolts (1) until the
seals begin to compress.
Loosen the safety bolts (2) then screw the main door xing
bolts (1) all the way in.
Tighten the safety bolts (2).
2
1
2
1
RTC 8000-RTC 10000
Remove the top prole (13), top panels (9) or (10) and side
panels (1) or (2) (depending on the position of the top
hinge).
1
13
9
2
10
Close the door and tighten the main xing bolts (1) until the
seals begin to compress.
Adjust the bolts (2) at the top hinge to adjust the position
of the door.
Screw the main door xing bolts (1) all the way in.
1
2
9
Make sure that the door is properly adjusted after every main-
tenance operation.

Table of Contents

Other manuals for Riello RTC Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Riello RTC Series and is the answer not in the manual?

Riello RTC Series Specifications

General IconGeneral
BrandRiello
ModelRTC Series
CategoryBoiler
LanguageEnglish

Related product manuals