Hardware Installation and Reference Guide Verifying Operating Status
39
5. After setting the parameters, click OK.
4.2 Powering on the Switch
Checklist before Power-on
Check that the switch is fully grounded.
Check that the power cord is properly connected.
Check that the power supply voltage meets the requirement of the switch.
Check that the control cable of the PC is correctly connected to the console port of the switch. Check that the HyperTerminal is
started and parameters are set correctly.
Checklist after Power-on (Recommended)
After power-on, check the following items.
Check that information is displayed on the terminal interface.
Check that the switch status LED is normal.
Check that the main program of the device is normally loaded.
Check that the time on the device is consistent with the current Beijing time.
Check that the service interface forwards data normally.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Ruijie RG-S2915-L Series and is the answer not in the manual?

Ruijie RG-S2915-L Series Specifications

General IconGeneral
BrandRuijie
ModelRG-S2915-L Series
CategorySwitch
LanguageEnglish

Related product manuals