2.4 Start up procedure
Install, wire, set and operate the controller referring to the procedure below when the product is used
for the first time.
(1) Checking the contents of the package
After unpacking everything, check the description on the label to identify the controller and the number
of accessories.
[Options]
• Controller communication cable(Part No: JXC-W2A-C)
• USB cable (Part No: LEC-W2-U)
•Teaching box (Part No: LEC-T1-3G)
If any parts are missing or damaged, please contact your distributor.
(2) Mounting the controller
Refer to section 3.4 Mounting (P.16) for instructions on how to mount the controller.
(3) Controller Setting
It is necessary to set the address by the rotary switch of the controller.
Refer to 4.1 Setting of switch (IP address) (P.18)
(4) PLC set up
Set the PLC parameter as a master station.
(5) Wiring and Connection
Connect the cables to the controller.
Refer to 5. External Connections (P.23) for the wiring of the connectors.