EasyManuals Logo
Home>SolarEdge>Recording Equipment>StorEdge BI-NUSGN-01

SolarEdge StorEdge BI-NUSGN-01 User Manual

SolarEdge StorEdge BI-NUSGN-01
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #20 background imageLoading...
Page #20 background image
Chapter 3: System Configuration
This chapter explains how to configure your Backup Interface using the SetApp mobile
application.
Before you begin, make sure the inverter firmware version is 4.8xx or higher. For
information on updating your inverter firmware, refer to the
Inverter Installation Guide
.
To set up communication with the Energy Meter
1. Make sure the StorEdge Connection Unit switch is OFF.
2. Switch the inverter ON/OFF/P switch to OFF.
3.
Access the SetApp and select Commissioning >Communication.
Communication
Server LAN
LAN DHCP
RS485-1
Modbus (Mutli-
Devices)
RS485-2
SolarEdge
Leader
ZigBee NA
Wi-Fi NA
Cellular PCL
GPIO RRCR
Modbus
TCPport
Disable
4. From the Communication screen, select RS485-1 > Protocol > Modbus (Multi-
Device).
5. Return to the RS485-1 screen and select Add Modbus Device > Meter.
6. Set the Energy Meter’s CT Rating according to the CT specifications. If the CT rating
value returns to 0, check communication with the CT.
7. Select Meter 1 > Meter Function > Export+Import (E+I).
Chapter 3: System Configuration 19
Backup Interface Installation Guide MAN-01-00728-1.0

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the SolarEdge StorEdge BI-NUSGN-01 and is the answer not in the manual?

SolarEdge StorEdge BI-NUSGN-01 Specifications

General IconGeneral
BrandSolarEdge
ModelStorEdge BI-NUSGN-01
CategoryRecording Equipment
LanguageEnglish

Related product manuals