Delivery, transport, storage |
3
4.1 Delivery
Each fan leaves our plant in an electrically and mechanically proper condition. We recommend transporting the fan to
the installation site in the original packaging.
Checking delivery
♦ Check the packaging and the fan for transport damage. Any findings should be noted on the cargo manifest.
♦ Check completeness of the delivery.
Unpacking
Warning
When opening the transport packaging, there is a risk of damage from sharp edges, nails, staples,
splinters etc.
♦ Unpack the fan carefully.
♦ Check the fan for obvious transport damage.
♦ Only remove the packaging shortly before assembly.
♦ Wear protective equipment during all work in the vicinity of the fan, details see 2.2 Personal protective
equipment, page 2.
4.2 Transport
Safety information
Warning: Electrical or mechanical hazards due to fire,
moisture, short circuit or malfunction.
♦ Never transport the fan by the connecting wire,
terminal box, impeller, protection grille, inlet cone or
silencer.
♦ In open transport, please make sure that no water can
penetrate into the motor or other sensitive parts.
♦ We recommend transporting the fan to the
installation site in the original packaging.
Caution: If transported without care during loading and
unloading, the fan may be damaged.
♦ Load and unload the fan carefully.
♦ Use hoisting equipment that is suitable for the weight
to be hoisted.
♦ Observe the transportation arrows on the packaging.
♦ Use the fan packaging exclusively as transport
protection and not as a lifting aid.
4.3 Storage
Safety information
Warning: Risk of injury and damage to the fan.
♦ Do not stack the fans on top of one another.
♦ Do not use transport packaging as hoisting aids.
♦ Use hoisting equipment that is suitable for the weight
to be hoisted.
Preconditions
♦ Store the devices in a clean, dry and vibration-free
environment.
♦ Storage temperature should be between 5°C and 40°
C.
Storage more than 3 months
♦ Turn the impeller at least 10 revolutions once a
month.
♦ Please ensure that the impeller is at a different
position afterwards.
Storage
more than 12 months
♦ We recommend an inspection by the after-sales
service of Systemair before commissioning.