IdentifyingtheTie-Down
Points
g281268
Figure30
1.Fronttie-downpoint2.Reartie-downpoint
HaulingtheMachine
•Usefull-widthrampsforloadingthemachineonto
atrailerortruck.
•Tiethemachinedownsecurely.
TowingtheMachine
Ensurethatthetowingvehiclecancontrolthe
combinedweightofbothvehicles;referto
Specications(page18).
RaisingtheCuttingUnits
Wheneverpossible,raiseandlatchthecuttingunits
beforetowingthemachine.
ReleasingtheWheel-MotorBrakes
1.Engagetheparkingbrakeandchockthewheels
ofthetowingvehicle.
2.Chockthefrontwheelsofthemachine.
3.Raisetheplatformforward;refertoRaisingthe
Platform(page37).
4.Removethe2bolts12x40mmand2washers
12mmstoredintheplatformsupportrails
(Figure31).
g292366
Figure31
1.Bolt12x40mmand
washers12mm
2.Platformsupportrail
5.Connectarigidtowbarbetweenthefronttow
ringofthemachineandthetowvehicle(Figure
32).
Note:Ifneeded,usethereartowringofthe
machinetopositionthemachinetoprovide
clearance,andusethefronttowringtotowthe
machine.
g328268
Figure32
6.Attheright,frontwheelmotorbrakeassembly
removethehexplug(Figure33).
30