ACC-SVN264B-EN 9
General Information - FIAECON103*
This section covers installation of low leak economizers for
12.5 to 25 ton downflow units in the D cabinet (digit 39 = D).
Inspection
1. Unpack all components of the kit.
2. Check carefully for shipping damage. If any damage is
fo
und, report it immediately, and file a claim against the
transportation company.
3. Visually inspect the components for shipping damage as
soon
as possible after delivery, before it is stored.
Concealed damage must be reported within 15 days.
4. If concealed damage is discovered, stop unpacking the
shipm
ent.
5. Do not remove damaged material from the receiving
loca
tion. Take photos of the damage, if possible. The
owner must provide reasonable evidence that the damage
did not occur after delivery.
6. Notify the carrier’s terminal of damage immediately by
p
hone and by mail. Request an immediate joint inspection
of the damage by the carrier and the consignee.
Note: Do
not attempt to repair any damaged parts until the
parts are inspected by the carrier’s representative.
Parts List
NOTICE
Corrosion Damage!
Failure to use recommended caulking/sealant could
cause corrosion related failures to refrigerant
components.
1
2
3
4
5
6
8
7
Carton A
Carton B
9
10
11
12
13
Outside Air Damper
Figure 10. Low leak economizer (12.5 to 25 tons - downflow)

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trane FIAECON203 Series and is the answer not in the manual?

Trane FIAECON203 Series Specifications

General IconGeneral
BrandTrane
ModelFIAECON203 Series
CategoryAir Conditioner
LanguageEnglish

Related product manuals