RTAA-SVX01A-EN 11
Installation — Mechanical
Foundation
Provide rigid, non-warping mounting pads or a concrete foundation of suffi-
cient strength and mass to support the outdoor unit operating weight (i.e.,
including completed piping, and full operating charges of refrigerant, oil and
water). Refer to Figure 13 for unit operating weights. Once in place, the
outdoor unit must be level within 1/4” (6.4 mm) over its length and width. The
Trane Company is not responsible for equipment problems resulting from an
improperly designed or constructed foundation.