BA D18 us* 1.1 * D18i400.fm 4-29
Putting into operation 4
4.4 Preparatory work
Important information before putting the machine into operation
Perform a visual check before starting work:
- There must be no leaks.
- There must be no damaged or loose parts.
- Do not allow anyone to stay in the danger zone.
Before putting the machine into operation, the operator must familiarize
himself with the position of the controls and instruments.
Only operate the machine from the seat with the seat belt fastened.
Before using the machine in work operation for the first time, Wacker Neuson
recommends trying out the machine on open ground without any obstacles.
When using the machine, check the surroundings constantly in order to
identify potential hazards in time.
Before starting work or when changing operators, ensure that all visual
aids (for example the mirrors) work correctly, that they are clean and
adjusted in accordance with the instructions in this Operator’s Manual.
The operator must follow the national and regional regulations.
Do not make any modifications that impair visibility. The machine does not
meet the requirements for conformity and registration.
Follow the safety instructions in the safety chapter see chapter “2.4
General Conduct and Safety Instructions for Operator‘s and Service
Personal” on page 2-2.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson DW100 and is the answer not in the manual?

Wacker Neuson DW100 Specifications

General IconGeneral
BrandWacker Neuson
ModelDW100
CategoryExcavators
LanguageEnglish

Related product manuals