FILLING IN
Go to the area to be filled in at a moderate speed with the bucket turned downwards so that its
base makes an angle of about 45° with the ground.
In proximity of the area to be filled in, slightly
raise the lifting arms and turn the shovel com-
pletely forward to unload all of the previously
accumulated material.
Pull back and repeat the operation until the
ground has been levelled.
Regarding loading capacity of the shovel, refer to the data supplied in the TECHNICAL
FEATURES AND DATA chapter. Do not overload the shovel.
An excessive load could cause loss of control or overturning of the machine with serious
risks for the operator.