65
14. SETUP CHECKLIST
* Setup DE/DT series units using the following procedure:
Installed by (company or
personnel)
Verify inlcuded accessories against
accessories column.
Caution: check for hazards
2. Pre-operation Procedures
1. Choose Appropriate Site
for Installation.
・Prepare installation space.
7. Arranging test samples
・・Measure line voltage (facility
power outlet or terminal) with
voltmeter.
・Measure line voltage during
operation.
(Must meet required voltage
rating)
Caution: confirm facility power
source rating meets unit
requirements
2. Pre-operation
Procedures
7. Connect power cable to
proper power supply
9. Ground wire must be
connected
10.Specifications
Power Supply (Required)
2. Pre-operation
procedures
Installation Precautions
4. Operation procedure
Setting Time & Date ~
Service & Repair
Explain function of each component
as written in instruction manual.
Setting Time & Date
1. Safety Precautions ~
14. List of Hazardous
Substances
Explain error codes and reset
procedures as written in instruction
manual.
Maintenance
and inspection
Explain function of each component
as written in instruction manual.
6. Maintenance Procedures
Setup
checklist
completion
・Fill in installation date and name of
installing personnel or company
on unit “OK and Service Sticker”.