FORM 100.10-NOM2
13
YORK INTERNATIONAL
FIG. 5 – TYPICAL CURB INSTALLATION ASSEMBLED AND CROSS-SECTIONS
LD06470
ROOF CURB
[TYPICAL DESIGN]
NOTES: 1. Curb, Nailer and Gasket only, furnished by YORK.
All other parts furnished “By Others”.
2. Roof Curb shipped in pieces for field assembly.
3. Roof Curb must be installed square and level.
4. Curb material is 14 gauge galvanized steel, unpainted
for 14", 18", 22"; 12 gauge for 26" & 30" curbs.
5. Curbs must be fully supported by the roof structure.
A = TOTAL UNIT LENGTH FROM YORKWORKS - 9”
B = TOTAL SEGMENT LENGTH AFTER COIL - 1"
C = COIL SEGMENT LENGTH - 3"
D = UNIT WIDTH - (SEE CHART)
TABLE 3 – CURB CALCULATION FOR INSIDE
DIMENSIONS
CURB WEIGHT = 8# / FOOT OF CURB PERIMETER
(FOR 14" H CURBS)
D = UNIT WIDTH
UNIT
INSIDE
WIDTH
65,125 29.75"
85, 170 41.75"
105, 215 53.75"
250, 350, 460 65.75"
305, 400, 530 77.75"
680 101.75"
860 113.75"
1030 137.75"
2

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the York CURBPAK CP23 and is the answer not in the manual?

York CURBPAK CP23 Specifications

General IconGeneral
BrandYork
ModelCURBPAK CP23
CategoryAir Handlers
LanguageEnglish

Related product manuals