FORM 160.54-O1
ISSUE DATE: 9/10/2014
JOHNSON CONTROLS
212
SECTION 4 - PRINTING
FIGURE 67 - SAMPLE PRINTOUT (SCHEDULE)
YORK SCHEDULE
CHILLER ID 3
© 1997 - 1999 YORK INTERNATIONAL CORPORATION
MON 29 MAR 1999 1 27 PM
SCHEDULE = OFF
STANDARD SCHEDULE
---------------------------------------------------------------------------------
SUN START = OFF STOP = OFF
MON START = 8:00 AM STOP = 5:00 PM
TUE START = 8:00 AM STOP = 5:00 PM
WED START = 8:00 AM STOP = 5:00 PM
THU START = 8:00 AM STOP = 5:00 PM
FRI START = 8:00 AM STOP = 5:00 PM
SAT START = OFF STOP = OFF
EXCEPTION DAYS
---------------------------------------------------------------------------------
02 APR 1999 START = OFF STOP = OFF
13 APR 1999 START = 8:00 AM STOP = 10:00 PM
FIGURE 68 - SAMPLE PRINTOUT (SALES ORDER)
YORK SALES ORDER
CHILLER ID 3
© 1997 - 1999 YORK INTERNATIONAL CORPORATION
MON 29 MAR 1999 1 28 PM
ORDER INFORMATION
---------------------------------------------------------------------------------
COMMISSIONING DATE = 01 JAN 1999
JOB NAME =
JOB LOCATION =
MODEL NUMBER =
YORK ORDER NUMBER =
PANEL SERIAL NUMBER =
CHILLER SERIAL NUMBER =
DESIGN LOAD - CONDENSER =
---------------------------------------------------------------------------------
PASSES =
DESIGN WORKING PRESSURE =
FOULING FACTOR =
PRESSURE DROP =
NOZZLE ARRANGEMENT IN =
NOZZLE ARRANGEMENT OUT =
LEAVING TEMPERATURE =
RETURN TEMPERATURE =
GPM =
TUBES =
DESIGN LOAD - EVAPORATOR
---------------------------------------------------------------------------------
PASSES =
DESIGN WORKING PRESSURE =
FOULING FACTOR =
PRESSURE DROP =
NOZZLE ARRANGEMENT IN =
NOZZLE ARRANGEMENT OUT =
LEAVING TEMPERATURE =
RETURN TEMPERATURE =
GPM =
TUBES =