EasyManuals Logo
Home>ABB>Intercom System>Welcome IP

ABB Welcome IP User Manual

ABB Welcome IP
191 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #62 background imageLoading...
Page #62 background image
Commissioning
System Manual
62
6 Commissioning
6.1 Overview of commissioning
Commissioning in three sections
Commissioning of the ABB-Welcome IP system is carried out in three sections.
Please observe the order of the steps. They are dependent on each other.
Step
1
Local addressing
For local addressing the physical addresses
are assigned for each participant in the "ABB-
Welcome IP" system.
see chapter 6.2 “Commissioning of a system
— Step 1: Local addressing “ on page 63
Step
2
Initial commissioning of "Smart Access Point" see chapter 6.3 “Commissioning of a system
— Step 2: Commissioning "Smart Access
Point"“ on page 83
Step
3
Searching and certifying
Searching and automatic certification of all
available participants in the "ABB-Welcome
IP" system.
Definition of trustworthy participants for door
opening (who can open the to whom).
Data backup
see chapter 6.4 “Commissioning a system —
Step 3: Searching and certifying“ on page 102

Table of Contents

Other manuals for ABB Welcome IP

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB Welcome IP and is the answer not in the manual?

ABB Welcome IP Specifications

General IconGeneral
BrandABB
ModelWelcome IP
CategoryIntercom System
LanguageEnglish

Related product manuals