EasyManuals Logo
Home>Airwell>Chiller>Itelco-Clima CLS 182 STD

Airwell Itelco-Clima CLS 182 STD User Manual

Airwell Itelco-Clima CLS 182 STD
83 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #76 background imageLoading...
Page #76 background image
Page 75
English
Maintenance
9 MAINTENANCE
Carefully read the “Safety” section of this manual
before carrying out any maintenance operations.
Do not discharge the refrigerant into the at-
mosphere while the refrigeration circuits
are being drained. Use appropriate recov-
ery equipment.
When the recovered refrigerant cannot be
re-used, return it to the manufacturer.
Do not throw away the waste oil of the
compressor, because it contains refrigerant
in solution.
The waste oil must be returned to the manu-
facturer.
Unless otherwise specified, the operations described
below may be carried out only by a trained mainte-
nance operator.
9.1 General requirements
Itelco-Clima units have been designed for continuous
operation, providing that they are subjected to regu-
lar maintenance, within the limits specified in this
manual. Each unit must be serviced according to the
programme by the User/Customer, and must be in-
spected at regular intervals by the personnel of one
of Itelco-Clima’s authorised Service Centers.
It is the responsibility of the User to meet these main-
tenance requirements and/or to enter into an agree-
ment with one of Itelco-Clima’s Service Centers, so
as to properly safeguard the operation of the appli-
ance.
During the warranty period, in case of damage or
failures caused by improper maintenance, Itelco-Cli-
ma will not refund the costs incurred to repair the ap-
pliance in its original state.
The provisions of this section apply only to standard
units; according to the order requirements, other
documentation may be added, concerning any mod-
ifications or supplementary accessories.
9.2 Planned maintenance
Maintenance inspections must be carried out accord-
ing to the program below, by a qualified person.
As a general rule, units cannot be repaired directly
by the user, who shall not try to service or repair any
failures or anomalies identified during daily inspec-
tions. If you are in doubt, please contact Itelco-Clima
Service Centre.
Planned maintenance
Operations
Daily
Weekly
Monthly
Beginning
of season
End of season
Check the temperature
of the leaving fluid
Check the pressure drops
in the heat exchanger
Check for electric
absorption
Check suction pressure
and temperature
Check delivery pressure
and temperature
Check the oil level
in the compressor
Check that there are no gas
bubbles in the liquid line
Check that the fins of the
external coil are clean (if any)
Check the operation
of the oil heaters
Check the remote
control switches
Check the operation
of the LP pressure switch
Check the operation
of the HP pressure switch
Check the insulation
of the heat exchanger
Check that terminals
are tightened
Check that the terminals’
screws are tightened
Clean the exterior of the
unit with water and soap
Check the density
of the antifreeze (if any)
Check the operation
of the flow switches
Check the operation
of the solenoid valve
••
••
Manuale CLS-CLH2 7.2.2005 10:23 Pagina 75

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Airwell Itelco-Clima CLS 182 STD and is the answer not in the manual?

Airwell Itelco-Clima CLS 182 STD Specifications

General IconGeneral
BrandAirwell
ModelItelco-Clima CLS 182 STD
CategoryChiller
LanguageEnglish

Related product manuals