IO-DAPPS www.daikinac.com 13
Commissioning Funcons
The topics in this secon are advanced topics for control technicians
and engineers. These topics cover procedures for the inial BACnet™
Thermostat setup.
The BACnet Thermostat commissioning funcons are values and
sengs that are entered during the installaon and commissioning of a
controller and the equipment it is controlling. Typically these funcons
do not change aer the installaon and commissioning process.
To set up the commissioning funcons, you will need the
following informaon.
• Informaon about the equipment
• The sequence of operaon for the equipment
• The building automaon plans for controllers that are part
of a network
Users may change the occupied heang and cooling setpoints without
accessing the commissioning funcons.
NOTE: The instrucons for the BACnet Thermostat commissioning
funcons cover all of the funcons that can be set in the
controller. Not all funcons are available on every model
of controller.
Enter the Commissioning Mode
For access to the commissioning funcons you will need to know
Password 2.
• If the controller has not been previously set up, no password
is required
• A new Password 2 can be entered in the advanced
commissioning funcons
Table 6: Enter the Commissioning Mode
Procedure Steps Display
Starng display Start from the temperature display
Enter the commissioning password
1. Press the le and right buons below the display at the same me
and hold them unl the display changes to the SECURITY USER
LEVEL display.
NOTE: If Password 2 has not previously been entered, the display
will change to the MAIN menu.
2. Press either the ▲ or ▼ buon to change the rst digit of
Password 2.
3. Press the Enter buon to select the next digit. Repeat for all four
digits. The Enter buon is the middle of the three buons below
the display.
Select a commissioning funcon
Access to the commissioning funcons always starts at the MAIN
menu display.
Program Set-Up