25-75 kW
User's and Installation Guide
22
3 UPS INSTALLATION PLAN AND UNPACKING
Use the following basic sequence of steps to install the UPS:
1. Create an installation plan for the UPS system
2. Prepare your site for the UPS system
3. Inspect and unpack the UPS cabinet
4. Unload and install the UPS cabinet, and wire the system
5. Complete the installation checklist (Chapter 10 Installation checklist)
6. Have authorized service personnel perform preliminary operational checks and startup.
NOTE
StartupandoperationalchecksmustbeperformedbyanauthorizedEatonCustomerServiceEngineer,orthe
warrantytermsspecifiedinWarrantybecomevoid.ThisserviceisofferedaspartofthesalescontractfortheUPS.
Contactserviceinadvance(usuallyatwo-weeknoticeisrequired)toreserveapreferredstartupdate.
3.1 Creating an Installation Plan
Before installing the UPS system, read and understand how these instructions apply to the system being
installed. Use the procedures and illustrations in Chapter 3.2 Site preparations and Chapter 4 UPS system
installation to create a logical plan for installing the system.
3.2 Site Preparations
For the UPS system to operate at peak efficiency, the installation site should meet the environmental
parameters outlined in these instructions. If the UPS needs to be operated at an altitude higher than 1000
m, contact your service representative for important information about high altitude operation. The operating
environment must meet the weight, clearance, and environmental requirements specified.
3.2.1 Environmental and Installation Considerations
The UPS system can be installed where there is TN or TT power distribution system.
The UPS system installation must meet the following guidelines:
•Thesystemmustbeinstalledonalevelfloorsuitableforcomputerorelectronicequipment.Thefloor
must be suitable for heavy weight and wheeling.
•Thesystemmustbeinstalledinatemperatureandhumiditycontrolledindoorareafreeofconductive
contaminants.
•Thecabinetcanbeinstalledinline-up-and-matchorstandaloneconfigurations.

Table of Contents

Other manuals for Eaton 93PR Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Eaton 93PR Series and is the answer not in the manual?

Eaton 93PR Series Specifications

General IconGeneral
BrandEaton
Model93PR Series
CategoryUPS
LanguageEnglish

Related product manuals