Advantages • Adaptable installation to any diameter main pipe and for tank
applications
• Ideal for flow and temperature conditioning
• Suitable for complex referrals and for use with heat
exchangers
• Suitable for step changes in viscosity
• Fast response
• Ideal for analyzer cubicles
Recommendations • Do not use with uncontrolled flow rates.
• Careful system design is required to ensure representative
measurement.
• Frequently requires the use of a pump.
2.6 Perform a pre-installation meter check
Check the meter prior to installation to confirm that no damage occurred to the meter
during shipment.
Procedure
1. Remove the meter from the box.
CAUTION
Handle the meter with care. Follow all corporate and government safety
regulations for lifting and moving the meter.
2. Visually inspect the meter for any physical damage.
If you notice any physical damage to the meter, immediately contact customer
support at flow.support@emerson.com.
3. Position and secure the meter in a vertical position with the flow arrow pointing
upward.
4. Connect the power wiring, and power up the meter.
Remove the back transmitter housing cover to access the PWR terminals.
Planning Installation Manual
May 2019 MMI-20020989
14 Micro Motion Fork Density Meter