1 Planning
Topics covered in this chapter:
•
Component identification
•
Installation checklist
•
Power requirements
1.1 Component identification
A. Dual core processor
B. 9-wire cable
C. Model LNGM10 for filling measurement
D. Model LNGS06 for returning measurement
1.2
Installation checklist
□
Make sure that the hazardous area specified on the approval tag is suitable for the
environment in which the LNG meters will be installed.
Planning
Quick Start Guide 1