EasyManuals Logo
Home>GE>Laboratory Equipment>AKTA avant

GE AKTA avant User Manual

GE AKTA avant
538 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #103 background imageLoading...
Page #103 background image
Install a module in the
instrument
The instruction below describes how to install the module hardware in the instrument.
The illustrations show the principle how to install an optional module. The
position of the module on the instrument and the used type of module will
depend on the module being installed.
Note:
CAUTION
Disconnect power. Always switch off power to the ÄKTA avant in-
strument before replacing any of its components, unless stated
otherwise in the user documentation.
ActionStep
Disconnect power from the instrument by switching off the instrument
power switch.
1
Loosen the connectors and remove the tubing from the existing module.
Note:
This step does not apply for a Module Panel.
2
Loosen the module with a Torx T20 screwdriver.3
ÄKTA avant User Manual 29035184 AE 103
4 Optional instrument modules
4.2 Installation of optional modules

Table of Contents

Other manuals for GE AKTA avant

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE AKTA avant and is the answer not in the manual?

GE AKTA avant Specifications

General IconGeneral
BrandGE
ModelAKTA avant
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals