GE HEALTHCARE
DIRECTION 5245279, REVISION 3 LOGIQ™ P6/P6 PRO SERVICE MANUAL
Section 3-1 - Overview 3-1
Chapter 3 Installation
Section 3-1Overview
3-1-1 Purpose of Chapter 3
This chapter contains information needed to install the unit. Included are references to a procedure that
describes how to receive and unpack the equipment and how to file a damage or loss claim.
How to prepare the facility and unit of the actual installation, and how to check and test the unit, probes,
and external peripherals for electrical safety are included in this procedure. Also included in this section
are guidelines for transporting the unit to a new site.
Table 3-1 Contents in Chapter 3
Section Description Page Number
3-1 Overview 3-1
3-2 Installation Reminders 3-2
3-3 Receiving and Unpacking the Equipment 3-4
3-4 Preparing for Installation 3-10
3-5 Completing the Installation 3-11
3-6 System Configuration 3-15
3-7 Available Probes 3-22
3-8 Software/Option Configuration 3-22
3-9 Connectivity Installation Worksheet 3-23
3-10 Insite IP Address Configuration 3-24
3-11 Loading Base System Software 3-24
3-12 Warnings 3-24
3-13 Paperwork 3-25