EasyManuals Logo

GE Venue 50 Service Manual

GE Venue 50
289 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #286 background imageLoading...
Page #286 background image
Index-2 Venue 50 – Basic Service Manual
5447566-100 English Rev. 7
environmental specifications for the unit, 2-4
errors, i-12
ESD, 1-26
ESD prevention, 1-27
F
facility needs, 2-11
desirable features, 2-13
DICOM network function, 2-16
DICOM setup requirements, 2-17
minimal floor plan suggestion, 2-14
network setup requirements, 2-16
purchaser responsibilities, 2-12
recommended floor plan suggestion, 2-14
required facility needs, 2-13
suggested floor plan
scanner and EchoPAC in same room,
2-14, 2-15
floor plan suggestion
mininal, 2-14
recommended, 2-14
scanner and EchoPAC in same room, 2-14,
2-15
functional checks, 10-12
mains cable inspection, 10-13
system checks, 10-12
G
GE Healthcare leakage current limits, 10-22
general console requirements, 2-3
generic procedure on probe leakage current, 10-30
grounding continuity, 10-25
H
hardware/software compatibility, 9-4
hardware-software
compatibility, 5-3
hot or cold
if the unit is very cold or hot, 2-3
how often should maintenance tasks be performed?,
10-5
human safety, 1-16
I
icons, 1-6
icons indicating a special procedure to be used, 1-9
if the unit is very cold or hot, 2-3
important precautions, i-2
installation
see "system setup", 3-1
installation warnings
see "setup warnings", 3-3
introduction (chapter 1), 1-1
L
legal notes, i-14
lighting, 2-5
list of abbrevations, 9-3
loading software, 8-13
lockout/tagout (LOTO) requirements, 1-24
LOTO
lockout/tagout requirements, 1-24
M
mains cable inspection, 10-13
maintenance
physical inspection, 10-14
preliminary checks, 10-11
system maintenance, 10-11
maintenance task schedule, 10-5
manufacturer, 1-29
mechanical safety, 1-18
model designations, 1-6
models covered by this manual, 1-5
Monitor Display, 4-10
N
network setup requirements, 2-16
No Probe, 3-43
O
omission and errors, i-12
operational and storage temperature for probes, 2-10
P
paperwork
after setup, 3-56
periodic maintenance inspection (PM), PM (periodic
maintenance inspection), 10-2
phone numbers
customer assistance, 1-29
physical dimensions, 3-29
physical inspection
at arrivel, 3-22
Power On, 3-28
precautions
certified electrical contractor statement, i-11
damage in transport, i-11
important precautions, i-2
service safety considerations, i-13
translation policy, i-2
prepeare for setup, 3-22
probe cleaning, 10-16
probe leakage current test, 10-29
probe maintenance, 10-15
basic probe care, 10-15
basic probe cleaning, 10-16
probe related checks, 10-15

Table of Contents

Other manuals for GE Venue 50

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE Venue 50 and is the answer not in the manual?

GE Venue 50 Specifications

General IconGeneral
BrandGE
ModelVenue 50
CategoryMedical Equipment
LanguageEnglish

Related product manuals