System Setup
3-24 Venue 50 – Basic Service Manual
5447566-100 English Rev. 7
Mounting the System to Docking Station/Cart
Follow these steps to mount the system to docking station/cart:
1. Place the docking station and system on a stable surface.
2. Carefully pick up the system. Align the port on the Venue 50
with the docking port and carefully push into place.
Figure 3-14. Mount to Docking Station/Cart
3. Press the locking lever down until it locks in place.
Figure 3-15. Press the locking lever