EasyManuals Logo
Home>Glow-worm>Boiler>ULTIMATE 30c

Glow-worm ULTIMATE 30c User Manual

Glow-worm ULTIMATE 30c
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
0020167175_01 - 02/13 - Glow-worm
2.3 Regulation and statutory requirements
2.3.1 CE Mark
This boiler meets the requirements of Statutory Instrument,
No. 3083 The Boiler (E ciency) Regulations, and therefore is
deemed to meet the requirements of Directive 92/42/EEC on the
e ciency requirements for new hot water boilers red with liquid
or gaseous fuels.
Type test for purposes of Regulation 5 certi ed by: Noti ed body
1312.
Product/production certi ed by: Noti ed body 0086.
The CE mark indicates that the appliances described in this
manual are in compliance with the following directives:
- European directive n°2009-142 relative to gas appliances
- European directive n°2004-108 from the European Parliament
and Council relative to electromagnetic compatibility
- European directive n°2006-95 from the European Parliament
and Council relative to low voltage
- European directive n°92-42 relative to the yield of boilers
2.3.2 Local regulations
Benchmark places responsibilities on both manufacturers
and installers. The purpose is to ensure that customers are
provided with the correct equipment for their needs, that it is
installed, commissioned and serviced in accordance with the
manufacturer’s instructions by a competent person approved
at the time by the Health and Safety Executive and that it meets
the requirements of the appropriate Building Regulations. The
Benchmark Checklist can be used to demonstrate compliance
with Building Regulations and should be provided to the
customer for future reference.
Installers are required to carry out installation, commissioning
and servicing work in accordance with the Benchmark Code
of Practice which is available from the Heating and Hotwater
Industry Council who manage and promote the Scheme.
Visit www.centralheating.co.uk for more information.
2.4 Hydraulic schematic
15
14
13
12
11
10
9
7
8
5
6
4
3
2
1
16
17
18
19
20
21
24
23
22
26
25
27
Key
1 Gas isolating valve
2 Heating ow isolating valve
3 Heating safety valve
4 Filter on cold water inlet
5 DHW ow sensor
6 Water pressure sensor
7 Domestic plate to plate heat exchanger
8 Three way valve
9 By-pass
10 Heating return thermistor
11 Condensate trap
12 Ignition and control electrode
13 Burner
14 Main heat exchanger
15 Thermal fuse
16 Flue outlet
17 Silencer
18 Heating expansion vessel
19 Fan
20 Gas control valve
21 Ignition module
22 Heating ow thermistor
23 Air vent
24 Pump
25 Manometer
26 Heating return isolating valve
27 Domestic cold water isolating valve
A Heating ow
B Pipe for heating safety valve
C Domestic hot water outlet
D Gas
E Cold water inlet
F Heating return
G Condensate drain
INTRODUCTION
- 4 -

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Glow-worm ULTIMATE 30c and is the answer not in the manual?

Glow-worm ULTIMATE 30c Specifications

General IconGeneral
BrandGlow-worm
ModelULTIMATE 30c
CategoryBoiler
LanguageEnglish

Related product manuals