EasyManuals Logo

Goodwe GW7600A-ES User Manual

Goodwe GW7600A-ES
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #30 background imageLoading...
Page #30 background image
27
02 Installation Instructions User Manual V1.6-2022-01-05
Step 1
Grid side
Step 2
Connect to CT
2.4.7 CT Connections
The two split-core current transformers (CTs) in product box must be installed for the system
to detect AC Mains current direction and magnitude; this data instructs the operation of A-ES
inverter based on operating mode.
Note:
1. The Smart Meter with CT is well congured, please do not change any setting on the Smart
Meter.
2. Each CT must be connected on a separate phase (e.g., L1 and L2)
3. Please use only the 2 CTs in the accessory box.
4. The CT cable is 10m (32.8 ft) as default.
5. CT cable can be extended to a maximum of 30m (98.4 ft), contact the support department to
achieve the maximum cable length.
If connecting CT’s to the line side of the main break, make sure the
AC conductors (L1 and L2) are totally isolated from AC power before
connecting a CT to each.
Assurez-vous que le câble AC est totalement isolé de la puissance AC
avant de connecter CT.
Connect CT1 and CT2 in
the accessories box to the
corresponding line at the
service entrance.
CT 1 connect to L1
CT 2 connect to L2
Utility
Meter
N
L2
L1
Grid
Load
CT 2
CT 1
Pass the other end of the CT through
the CT port and insert the 4-Pin
terminal to the "Connect to CT"
DANGER!

Other manuals for Goodwe GW7600A-ES

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Goodwe GW7600A-ES and is the answer not in the manual?

Goodwe GW7600A-ES Specifications

General IconGeneral
BrandGoodwe
ModelGW7600A-ES
CategoryInverter
LanguageEnglish

Related product manuals