JB Academy, JB Nova and SUB Aqua Pro 31394 V7
Detailed operating manual Page 7
www.grantinstruments.com
5 Operating instructions
5.1 Unpacking instructions
Standard equipment includes:
Thermostatic water bath
Mains cord with plug
Gabled polycarbonate lid (excludes JB Academy, no lid supplied and SAP34,
stainless steel lid supplied)
Polycarbonate base tray(s) (excludes SAP34, stainless steel base tray)
Short user guide
Remove packing materials carefully, and retain for future shipment or storage of the
equipment.
5.2 Assembly of the equipment and components
The water bath has three main components, the bath, the lid and the base tray. The
base tray fits into the bath with the feet downward so that it creates a gap between the
bottom of the tank and the tray.
For optimum temperature stability, avoid allowing the base tray to touch
the sides of the tank when using water.
The base tray must be removed when using heat transfer beads
The lid should only be lifted by the handle, as other parts can become hot during use. It
also has a vent/thermometer hole – this hole should not be sealed as pressure could
build up inside the bath.
5.3 Installation
Place the water bath on a level, non-combustible surface. Ensure that the mains plug
and the switch are easily accessible.
5.4 Electrical supply
Check that the supply voltage marked on the serial number label, and the type of mains
plug, are correct for your mains supply outlet, which must have a ground connection.
To disconnect the equipment from the mains supply, remove the mains plug from the
mains supply outlet.