EasyManuals Logo
Home>Gree>Air Conditioner>GMV-ND22PLS/A-T

Gree GMV-ND22PLS/A-T Service Manual

Gree GMV-ND22PLS/A-T
227 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #130 background imageLoading...
Page #130 background image
MULTI VRF-â…¡ INDOOR UNIT SERVICE MANUAL EUROPEAN/LATIN AMETICA (R410A)
126
4 Disassembly And Assembly Procedure Of
Main Parts
4.1 Floor Standing Type
Removal and Assembly of electric box
Remarks: Before removing the electric box, make sure to cut off the power firstly.
Step
Illustration
Handling Instruction
1. Loosen the
buckles on both
sides of the
bottom panel.
Cut off the power
supply of indoor unit.
Loosen the buckles on
both sides of the
bottom panel.
2. Unscrew the
screws on the
bottom panel and
then pull it out
outwards.
Unscrew the screws on
the bottom panel and
then pull it out
outwards.
3. Unscrew the
screws on the
electric box and
then open the
cover of it.
Unscrew the screws on
the electric box and
then open the cover of
it.
4. Connect the
power cord and
the connection
pipe.
Connect the power
cord and the
connection pipe.
4.2 High Static Pressure Duct Type
Note: The following steps are specific for GMV-ND71PHS/A-T units. For other units, the assembly

Table of Contents

Other manuals for Gree GMV-ND22PLS/A-T

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gree GMV-ND22PLS/A-T and is the answer not in the manual?

Gree GMV-ND22PLS/A-T Specifications

General IconGeneral
BrandGree
ModelGMV-ND22PLS/A-T
CategoryAir Conditioner
LanguageEnglish

Related product manuals