GMV5 Home DC Inverter Multi VRF Units
210
db
ON
16
ON
U8
ON
System detects pipe failure of indoor
unit. XXXX means the project number
of faulty indoor unit. 3s later, U8 will be
displayed. For instance, if no.100
indoor unit has U8 error, then LED3 will
display circularly as below: 01(2s later),
00(2s later), U8.
17_
Commissioning
completed
01~04
ON
OF
ON
OF
ON
The unit has completed commissioning
and in standby status. LED1 displays
module address. LED2 and LED3
display ―OF‖.
4.2.2.2 Commissioning Operation Mode
There are two commissioning modes for the unit. One is to perform commissioning directly
through the main board of outdoor unit. The other is to perform commissioning on a PC through
special software. Parameters of ondoor units and outdoor unit can be simultaneously displayed
and historical data can be stored and queried with the second method. (For details about the two
methods, please refer to relevant instructions.)
Commissioning through the main board of outdoor unit:
Basic operation
Operation method
Remarks
Start of
commissioning
Press and hold SW7 button on master
control unit for more than 5 seconds.
Selection of
commissioning
operation mode
without wired
controller
After the unit has started
commissioning, press SW4 button and
SW5 button simultaneously under any
commissioning phase.
After entering this mode, system will
no longer detect the communication
status between indoor unit and wired
controller. Indoor units can proceed
with commissioning without wired
controller.
Exit of
commissioning
After the unit has started
commissioning, press and hold SW7
button on master control unit for more
than 5 seconds to quit commissioning.
Pause of
commissioning
After the unit has started
commissioning, short press SW6 back
button on master control unit to interrupt
commissioning. Then system will stay
in the last completed progress of the
current commissioning phase.
This function is available after the 9
th
step. For example, when system
receives commissioning pause signal
during the 10
th
step 10_Outdoor unit
valves detection before startup, it will
return to the completion status of the
9
th
step 9_Refrigerant detection before
startup.
Continue of
commissioning
When commissioning is paused, short
press SW6 back button on master
control unit again to continue
commissioning.
When commissioning is performed through the main board of outdoor unit, the main board
provides the following commissioning functions:
Step 1: Cover the front panel of outdoor unit completely and open the commissioning window
of outdoor unit.
Step 2: Under power-off status of outdoor unit, set up corresponding static pressure mode for

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Gree SXVD200LCJ2/A-K and is the answer not in the manual?

Gree SXVD200LCJ2/A-K Specifications

General IconGeneral
BrandGree
ModelSXVD200LCJ2/A-K
CategoryInverter
LanguageEnglish

Related product manuals