28
Installation EAGLE20/30
Release
06
04/2014
2 Installation
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
The following steps should be performed to install and configure a device:
Unpacking and checking the content of the package
Installing the SD card (optional)
Installing and grounding the device
Installing an SFP transceiver (optional)
Connecting the terminal blocks
Operating the device
Connecting data cables
Insert data in label area
2.1 Unpacking and checking the content of the
package
Check whether the package includes all items named in section “Scope
of delivery” on page 49.
Check the individual parts for transport damage.
2.2 Installing the SD card (optional)
Note: For information about the position on the device see “Rear view” on
page 21.
Push the SD card into the slot with the serration facing downwards.
Tighten the thumb screw to fix the SD card.