5-14
1. After filling soil into the bucket, dump the bucket gradu
-
ally to disperse soil while driving the machine in reverse.
2. Lower the bucket teeth tips onto the ground. Grade and
level the ground surface while driving the machine in re
-
verse with the bucket teeth tips dragging
3. After filling the bucket with a load such as soil, posi
-
tion the bucket level with the ground surface. Finish the
ground surface utilizing the bucket weight. At this time,
drive the machine in reverse with the lift arm held in the
FLOAT position.
M4GB-05-011
M4GB-05-012
M4GB-05-013