Table 7-1 LED indicator description
LED Indicator Status Meaning
Green o There is no operation
with a USB ash drive.
Blinking green slowly There is an operation
with a USB ash drive.
Blinking green fast An operation with a
USB ash drive has
failed.
Steady green An operation with a
USB ash drive is
successful.
5. Insert the USB
ash drive into a computer and check the exported data.
When the conguration export is complete, the boot script le and exported le are in
the root directory of the USB
ash drive.
7.2.2 Importing
Congurations
Prerequisites
A complete
conguration le has been exported.
Procedure
1. Click Local maintenance script on the app to generate a boot script
le, see
the
FusionSolar APP and SUN2000 APP User Manual
.
2. Import the boot script le to a PC.
3. Replace the exported boot script
le in the root directory of the USB ash
drive with the imported one.
Replace the boot script le only and keep the exported les.
4. Connect the USB ash drive to the USB port. The system automatically
identies the USB ash drive and executes all commands specied in the boot
script le. View the LED indicator to determine the operating status.
SUN2000-(196KTL-H0, 200KTL-H2, 215KTL-H0)
Series
User Manual 7 Man-Machine Interactions
Issue 07 (2021-07-08) Copyright © Huawei Technologies Co., Ltd. 79