EasyManuals Logo
Home>IBM>Storage>Storwize V7000 Unified

IBM Storwize V7000 Unified Quick Installation Guide

IBM Storwize V7000 Unified
108 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #5 background imageLoading...
Page #5 background image
Figures
1. This figure shows 12 drives and two end caps
(model 2076-112). ...........3
2. This figure shows 24 drives and two end caps
(model 2076-124). ...........4
3. Rear view of a model 2076-112 or a model
2076-124 control enclosure ........4
4. This figure shows the data ports in the rear of
the control enclosure...........5
5. 10 Gbps Ethernet ports on the rear of the
Storwize V7000 enclosure ........6
6. Rear view of a model 2076-212 or a model
2076-224 expansion enclosure .......6
7. SAS ports and LEDs in rear of expansion
enclosure..............7
8. Front view of file module ........8
9. Rear view of file module ........8
10. Recommended rack locations ......10
11. Examples of the IP addresses and network
services needed for the system. The expansion
enclosures are not shown. ........13
12. Here are examples of IP addresses and
network services needed for the system. The
expansion enclosures are not shown. ....16
13. Securing an enclosure to a rack cabinet 30
14. Hole locations in the front of the rack ....31
15. Hole locations in the back of the rack ....32
16. Removing the enclosure end cap .....33
17. Securing an enclosure to a rack cabinet 34
18. Cable management arm box contents. ....35
19. Friction rail box contents. ........36
20. Locate a 2U space in the lower section of the
rack. ...............36
21. Open the rear slide rail hooks. ......37
22. Install the rear end of the slide rails. ....37
23. Install the front end of the slide rails. ....38
24. Install the front end of the slide rails. ....38
25. Install the file module on the slide rails. 39
26. Slide the file module into the rack. .....39
27. Install the cable management support arm. It
can be installed on either side (left or right).
The graphic shows the rear of the rack. . . . 40
28. Install the cable management arm. .....40
29. Adjust the location of the cable management
arm. ...............41
30. Connect and route the cables. ......41
31. Secure the cable management arm and the file
module in the rack for shipping if needed. . . 42
32. Install the front screws. ........42
33. Internal cabling connections between the
control enclosure (A) and the expansion
enclosures (B & C). ..........44
34. Attaching an expansion enclosure to the
control enclosure...........45
35. Adding a second expansion enclosure....46
36. Attaching SAS cables to the enclosures 47
37. Control enclosure Ethernet network
connections. ............48
38. 10 Gbps Ethernet ports on the rear of the
Storwize V7000 enclosure ........49
39. File module Ethernet direct connections. 50
40. Diagram showing how to connect the file
modules to the control enclosure using Fibre
Channel cables. Refer to previous table. . . . 53
41. Unlocking the cable retention bracket ....55
42. Sliding the cable retention bracket directly
behind the power cord .........56
43. 24 drives and two end caps .......57
44. 12 drives and two end caps .......57
45. LEDs on the power supply units of the
expansion enclosure..........58
46. LEDs on the power supply units of the control
enclosure .............59
© Copyright IBM Corp. 2011, 2012 v

Table of Contents

Other manuals for IBM Storwize V7000 Unified

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Storwize V7000 Unified and is the answer not in the manual?

IBM Storwize V7000 Unified Specifications

General IconGeneral
BrandIBM
ModelStorwize V7000 Unified
CategoryStorage
LanguageEnglish

Related product manuals