Note: Make sure the top and the bottom of the power supply align with the
upper and lower tabs on the opening.
4. Install the screws that secure the power supply to the chassis.
5. Install the air duct.
6. Install the side cover (see “Installing the side cover” on page 167).
7. Stand the server back up in its vertical position.
8. Install bezel (see “Installing the bezel” on page 171).
9. Reconnect the external cables and power cords; then, turn on the attached
devices and turn on the server.
Removing the hot-swap power supply
This procedure applies only to the 5U server model with hot-swap power supplies
(Model name: 2582-F4x).
Chapter 5. Removing and replacing server components 243