EasyManuals Logo
Home>IDEAL>Boiler>INDEPENDENT COMBI 24

IDEAL INDEPENDENT COMBI 24 User Manual

IDEAL INDEPENDENT COMBI 24
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #55 background imageLoading...
Page #55 background image
55
Installation and Servicing
SECTION 3 - SERVICING
3.33 EXPANSION VESSEL RECHARGING & REPLACEMENT
8
9
RECHARGING
1. Refer to Section 3.8.
2. Remove the charge point cover.
3. Recharge the tank pressure to 0.75 bar.
4. Re-assemble in reverse order.
5. Check that the boiler operates in both DHW &
CH modes.
REPLACEMENT
6. Refer to Section 3.8.
7.
Drain the boiler CH circuit. Refer to Section 3.22.
8. Remove the retaining clip on the vessel water
connection pipe and remove the pipe.
9. Support the expansion vessel and unscrew the
2 screws from the securing bracket, located
on the top of the boiler, and remove. (Note the
position of the bracket on the vessel)
10. Remove the expansion vessel.
11. Fit the new expansion vessel.
12. Reassemble in reverse order ensuring the seal
is in place.
13. Rell the boiler and check for leaks. Refer to
Section 2.16.
14. Check tht the boiler operates in both DHW &
CH modes.
Recharge
Point
SERVICING

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IDEAL INDEPENDENT COMBI 24 and is the answer not in the manual?

IDEAL INDEPENDENT COMBI 24 Specifications

General IconGeneral
BrandIDEAL
ModelINDEPENDENT COMBI 24
CategoryBoiler
LanguageEnglish

Related product manuals