-40-
6 Operating Instructions
AC800 Series Intelligent Machine Controller Hardware User Guide
3RZHURIIHYDOXDWLRQ9ROWDJHGURSV 6\VWHPVWRSV
2SHUDWLRQVDIWHUHYDOXDWLRQ
DC: below 22.5V
3RZHURIIHYDOXDWLRQWLPH
DC:15ms
3RZHURIIGHWHFWLRQGHOD\
100-200ms
8VHUSURJUDPH[HFXWHV 6\VWHPUHVHWV
After the power-o evaluation time, even if the voltage is reset, the PLC still stops running, as shown in the
following gure:
DC:15ms
100-200ms
Į,QHIIHFWLYH
3RZHURII
HYDOXDWLRQ
9ROWDJHGURSV
6\VWHPVWRSV
2SHUDWLRQVDIWHUHYDOXDWLRQ
DC: below 22.5V
3RZHURIIHYDOXDWLRQWLPH
3RZHURIIGHWHFWLRQGHOD\
8VHUSURJUDPH[HFXWHV 6\VWHPUHVHWV
The times in the above gure are described as follows:
Item Description
Power-o evaluation time
The time after the power supply voltage drops until the UPS power
supply detects that the power supply is o. Before it is determined
that the power supply is o, the PLC continues to operate.
Power-o detection delay
The period from the time when the UPS detects that the power supply
is o to the time when the PLC starts to perform power-o operations.
6.2.2 Operations at Instantaneous Power-o
When an instantaneous power-o occurs within the following time, the user program will continue to be
executed.
Power Type Time before Power-o
Non-UPS Power o immediately
UPS Below 15 ms
,QVWDQWDQHRXV
SRZHURIIWLPH
9ROWDJHGURSV
8VHUSURJDUPFRQWLQXHV
DC: below 22.5V
3RZHURIIHYDOXDWLRQWLPH
DC:15ms
3RZHURIIGHWHFWLRQGHOD\
100-200ms
8VHUSURJUDPH[HFXWHV
9ROWDJHUHVHWV