EasyManuals Logo
Home>jcb>Excavators>8025 ZTS

jcb 8025 ZTS User Manual

jcb 8025 ZTS
332 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #176 background imageLoading...
Page #176 background image
Operation
Storage of the Machine
158 158
9811/9950-1
1 Clean the machine to remove all unwanted material
and corrosives.
Remove the grease or petroleum jelly from the ram
piston rods.
2 Install a charged battery.
3 Examine all fluid levels. Top up if necessary.
4 Start the engine.
5 Operate the hydraulic controls.
Make sure that the hydraulic functions operate
correctly.
6 Prepare the machine for storage. Refer to Put the
Machine into Storage.
Take the Machine Out of Storage
T2-079
1 Examine the coolant condition. Replace If necessary
2 Examine all fluid levels. Top up if necessary.
3 Clean the machine to remove unwanted material and
corrosives.
Remove the grease or petroleum jelly from the ram
piston rods.
4 Install a charged battery.
5 Start the engine.
6 Operate the hydraulic controls.
Make sure that the hydraulic functions operate
correctly.
HE Services

Table of Contents

Other manuals for jcb 8025 ZTS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the jcb 8025 ZTS and is the answer not in the manual?

jcb 8025 ZTS Specifications

General IconGeneral
Brandjcb
Model8025 ZTS
CategoryExcavators
LanguageEnglish

Related product manuals