6-4 CK25/30/35
3-POINT HITCH
MAKE PREPARATIONS FOR
ATTACHING IMPLEMENT
SELECTING THE TOP LINK MOUNT-
ING HOLES
Select the proper set of holes to give
you the proper lift of the implement you
are using. This requires some experi-
ment- action to achieve proper lift. Re-
move the clip pin, then the bolt, move
to chosen hole, replace pin and clip.
DRAWBAR
Remove the drawbar if close mounted
implement is being attached.
ATTACHING AND DETACHING
IMPLEMENTS
(1) Handle
(2) Crank Lifting Rod (Right)
(3) Lower Link
704O604C704O603C
To avoid personal injury:
zz
zz
z Be sure to stop the engine.
zz
zz
z Do not stand between tractor
and implement unless parking
brake is applied.
zz
zz
z Before attaching or detaching
implement, locate the tractor
and implement on a firm level
surface.
zz
zz
z Whenever an implement or
other attachment is connected to
the tractor 3-point hitch, check
full range of operation for
interference, binding or PTO
separation.
!!
!!
!
CAUTION