2-2 Operation TP-5592 7/96
Exercising the Generator Set
Run the generator set under load once each week for
one hour with an operator present.
Perform all prestart checks before starting the exercise
procedure. Withthe generator setoperating, listen fora
smooth-running engine, and visually inspect the
generator set to ensure there are no fluid or exhaust
leaks.
Start the generator set according to the starting
procedure in the controller section of this manual.
Controller
For identification of controller components, see
Figure 2-1.
1. Start/StopSwitch.Useswitchtostartandstopthe
generator set. Refer to Starting and Stopping
following.
2. DC Circuit Breaker. The generator set will shut
down automatically after fault. See Circuit
Protection following.
3. ACCircuitBreaker(optional).Thecircuitbreaker
trips when a fault is detected in the output circuit.
During maintenance of craft wiring, the circuit
breaker disconnects the generator set . To close
circuit breaker(s), place breaker in ON position.
4. Remote Start Connector. A 6-pin connector on
controller back panel allows connection of
(optional) remote start kits.
5. Hourmeter. Records total generator set operating
hours for reference in maintenance scheduling.
1
2
3
4
5
ADV-5852-A
1. Start/Stop switch
2. DC circuit breaker
3. AC circuit breaker (optional)
4. Remote start connector
5. Hourmeter
Figure 2-1. Controller