EasyManuals Logo
Home>Kohler>Engine>Command CV17

Kohler Command CV17 User Manual

Kohler Command CV17
217 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #156 background imageLoading...
Page #156 background image
8.40
Section 8
Electrical System and Components
Plunger
Pushed “In”
VOM Meter
Leads
12 volt Test Leads
Test 4. Solenoid Hold-In Coil/Contact Continuity
Test.
Use an ohmmeter set to the audible or Rx2K scale, and
connect the two ohmmeter leads to the two large post
terminals. Perform the preceding test (3) and check for
continuity. See Figure 8-77. The meter should indicate
continuity, if no continuity is indicated the solenoid
should be replaced. Repeat test several times to
confirm condition.
Figure 8-77. Testing Hold-In Coil/Solenoid Contact
Continuity.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Kohler Command CV17 and is the answer not in the manual?

Kohler Command CV17 Specifications

General IconGeneral
BrandKohler
ModelCommand CV17
CategoryEngine
LanguageEnglish

Related product manuals