22. TRAVEL OPERATIONS
3-38
22.8 LOAD HANDLING OPERATION
22.8.1 LOADING
1. Stop slowly when reaching the stacking location.
2. Tilt the mast forward until it is vertical.
3. Raise the load to 2 - 4 in. (5 - 10 cm) above the stacking point.
4. Drive slowly forward.
• Check that there is no danger of collapse or breakage of the load at the loading point.
• Check that the loading position is correct.
• Never push the load with the fork tips.