4.3 Power modules installation
Once all the electrical connections have been made, close the distribution panels and fix them by screwing all the hex
socket M6x16 screws along with M6 toothed washers.
It is then possible to move onto the insertion of the power modules into the UPS.
During the installation it is necessary to use the appropriate Personal Protective Equipment like protective gloves and
anti-accident shoes (see paragraph 2.3).
INDICATION
To guarantee the stability of the Keor MOD 125 cabinet, first install the power modules and only later the battery drawers.
Insert the power modules one at a time starting from the top of the cabinet.
Unscrew the four screws that fix the slot cover where the power module must be installed and save them.
Handle the power module from his sides and never from the front.
4. Installation

Table of Contents

Other manuals for LEGRAND Keor MOD Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the LEGRAND Keor MOD Series and is the answer not in the manual?

LEGRAND Keor MOD Series Specifications

General IconGeneral
BrandLEGRAND
ModelKeor MOD Series
CategoryUPS
LanguageEnglish

Related product manuals