EasyManuals Logo
Home>LEGRAND>UPS>Keor MOD Series

LEGRAND Keor MOD Series Installation And Maintenance Manual

LEGRAND Keor MOD Series
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #60 background imageLoading...
Page #60 background image
60
4.4 Battery drawers installation
The cabinet for Keor MOD 125 may include two to ten internal battery drawers. Each battery string is made up of two
drawers, therefore it is necessary to install them two by two.
The battery drawers have a specific order in the cabinet that must be kept, especially if the UPS has to work in a configu-
ration with indipendent strings of batteries.
During the installation it is necessary to use the appropriate Personal Protective Equipment (see paragraph 2.3).
4. Installation

Table of Contents

Other manuals for LEGRAND Keor MOD Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the LEGRAND Keor MOD Series and is the answer not in the manual?

LEGRAND Keor MOD Series Specifications

General IconGeneral
BrandLEGRAND
ModelKeor MOD Series
CategoryUPS
LanguageEnglish

Related product manuals