10
Lift the base. Insert wood shims on the oor around the
outline of the base on the previously marked spots to
compensate leveling.
Lower the base and validate leveling and the stability of
the base on the oor. If needed, use additional shims.
2
STEP Installing the base (cont'd)
Distinct / Zone Square
2.4
Check me!
COMPATIBLE BASES No.
Distinct 4832 106350
Zone square 4832 106351
Zone square 6032 106352 - 106353
Leveling the base is critical
for wall alignment
Verify the base leveling. Mark the studs and the oor
where shims will be required to perfectly level the base.
If the base is completely leveled go to step 2.5
2.3
Check me!
13