EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove RT540E

Manitowoc Grove RT540E User Manual

Manitowoc Grove RT540E
160 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #115 background imageLoading...
Page #115 background image
Published 01-15-2016, Control # 526-01 4-1
RT540E OPERATOR MANUAL SET-UP AND INSTALLATION PROCEDURES
4
GROVE
SECTION 4
SET-UP AND INSTALLATION PROCEDURES
SECTION CONTENTS
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1
Installing Cable on the Hoist . . . . . . . . . . . . . . . . . 4-1
Anti Two Block (A2B) Switch. . . . . . . . . . . . . . . . . 4-2
Lock . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
Unlock. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
Before Operation . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
Cable Reeving. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4
Dead-end Rigging/wedge Sockets . . . . . . . . . . . . 4-8
Installing Wedge And Socket . . . . . . . . . . . . . . . . 4-8
Dead-end Rigging . . . . . . . . . . . . . . . . . . . . . . . . . 4-9
Erecting And Stowing The Boom Extension . . . 4-10
General Warnings . . . . . . . . . . . . . . . . . . . . . . . . 4-10
Erecting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-10
Stowing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-12
Setting The Offset . . . . . . . . . . . . . . . . . . . . . . . . 4-13
Changing Boom Extension From Telescoping
Type To Fixed Type. . . . . . . . . . . . . . . . . . . . . . . 4-13
Setting The Telescoping Extension Length. . . . . 4-14
Counterweights . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-14
GENERAL
This section provides procedures for installing the hoist
cable on the hoist drum, cable reeving, and erecting and
stowing the boom extension.
INSTALLING CABLE ON THE HOIST
NOTE: The cable should preferably be straightened before
installation on the hoist drum.
Install cable on the hoist drum in accordance with the
following procedure.
1. Position the cable over the boom nose sheave and route
to the hoist drum.
2. Position the hoist drum with the cable anchor slot on top.
3. Insert the cable through the slot and position around the
anchor wedge (1) (Figure 4-1).
NOTE: The end of the cable should be even with the
bottom of the slot for the anchor wedge.
4. Position the anchor wedge in the drum slot; pull firmly on
the free end (2) of the cable to secure the wedge.
5. Slowly rotate the drum, ensuring the first layer of cable is
evenly wound onto the drum.
6. Install the remainder of the cable, as applicable.
NOTE: If the wedge does not seat securely in the slot,
carefully tap (3) the top of the wedge with a mallet.
CAUTION
If cable is wound from the storage drum, the reel should
be rotated in the same direction as the hoist.
FIGURE 4-1
1
2
2
3
7312
7196
Reference Only

Table of Contents

Other manuals for Manitowoc Grove RT540E

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove RT540E and is the answer not in the manual?

Manitowoc Grove RT540E Specifications

General IconGeneral
BrandManitowoc
ModelGrove RT540E
CategoryConstruction Equipment
LanguageEnglish

Related product manuals