417
66 42
45
56
(19)370
28
53
175600175
330
2-12%36 oval holes
(Foundation Bolt M10)
Air Discharge
Rear Air Intake
Side Air Intake
2-U Shaped notched holes
(Foundation Bolt M10)
Installation Feet
30
Over
Over
Less than
Piping and wiring connections
can be made from 4 directions:
front, right rear and below.
4 PIPING-WIRING DIRECTIONS
3 FOUNDATION BOLTS2 SERVICE SPACE
1 FREE SPACE (Around the unit)
Piping Knockout Hole Details
Example of Notes
···Refrigerant GAS pipe connection (FLARE)W15.88(5/8 inch)
···Refrigerant LIQUID pipe connection (FLARE)W 9.52(3/8 inch)
+1 ···Indication of STOP VALVE connection location.
The diagram below shows a
basic example.
Explanation of particular details is
given in the installation manuals etc.
Over10
500
500
Over100
Dimensions of space needed
for service access are
shown in the below diagram.
Service space
30
Please secure the unit firmly
with 4 foundation (M10) bolts.
(Bolts and washers must be
purchased locally.)
<Foundation bolt height>
Handle for moving
Side Air Intake
Front piping cover
Rear piping cover
14522030 145
81 219
145
71
71
Drain hole
(5-W33)
Bottom piping hole
(Knockout)
Air Intake
Rear Air Intake
Handle for moving
Handle for moving
23
943
473
950
322
+1 447
+1 443
670
Terminal Connections
Left···Power supply wiring
Right···Indoor/Outdoor wiring
Earth terminal
Service panel
Handle for moving
Handle for moving
1
2
19 55
23 27 92
92
4075
73 63
Right piping hole
(Knockout)
Right trunking hole
(Knockout)
Power supply wiring hole
(2-W27Knockout)
W
92
27 55
73
23 63
40
92
65
45
Front piping hole
(Knockout)
Front trunking hole
(Knockout)
Power supply wiring hole
(2-W27Knockout)
W
92
4045
65
92
27 55
23
73 63
Rear piping hole
(Knockout)
Rear trunking hole
(Knockout)
Power supply wiring hole
(2-W27Knockout)
W
92
FOUNDATION
Over 10mm
Over 10mm
Over 500mm
Over 100mm
FREE